Q2 Artificial Lift Services has designed an effective yet simplistic gas anchor to produce high GOR wells using existing pumping equipment. It eliminates many pump related problems such as gas locking, decreased production rates and reduced efficiency. This proven technology, includes several metallurgical designs, to assist in any well condition.
Read more
Q2-Shear Tool
Q2-Shear Tool is designed to protect sucker rod string from excess stress. It is designed to fail at a predetermined load, which is less than the maximum allowable load of sucker rod string. Q2-Shear Tool is used to disconnect the sucker rod string from the pump when pump seizes or rod gets stuck in the…
Read more
Q2-Check (Top Check Valve)

The Q2-Check Valve prevents gas locking, reduce fluid pound by neutralize the effect of the hydrostatic weight of the fluid load above the travelling valve.
Read more
Q2-Seal Wiper System

Our Q2-Seal is designed to keep sand out of plunger/barrel interface by wiping the inside of barrel and preventing solids from entering this critical area while the pump produces fluids to the surface.
Read more
- 1
- 2